- Access
- Public land where the managing agency allows collecting
- Collecting
- Allowed with a permit
- Cost
- Not listed
- Season
- Not listed
What you can find
Not listed. The land manager allows collecting here but does not say what you are likely to find, so we do not guess. “Collecting allowed” means it is legal, not that every kind of rock turns up.
Section of the San Miguel River on BLM land near Piñon Bridge that is open to non-motorized panning and sluicing with a notification filed at the Uncompahgre Field Office. The river upstream of the bridge in two posted sections is closed to placer work.
Land manager and access
- Permit
- File a recreational placer mining notification form with the BLM Uncompahgre Field Office in Montrose (970-240-5300) before working. Source: blm.gov (opens in a new tab), checked November 19, 2026
- Federal land records
- USGS PAD-US lists the mapped point as Uncompahgre Field Office (BLM). Checked November 20, 2026 against PAD-US 4.1.
Getting there
- Directions
- Not listed
- Road
- Not listed
- Vehicle
- Not listed
- Walk in
- Not listed
- Coordinates
- 38.26320, -108.40010 Public access point given by the land manager. Google Maps Apple Maps Source: blm.gov (opens in a new tab), checked November 19, 2026 (one of two latitude/longitude labels printed on the BLM Piñon Bridge area map; the other labeled point lies on an active claim)
- Website
- Not listed
Fees and hours
- Fee
- Not listed
- Hours
- Not listed
Season
- Season
- Not listed
Tools allowed
- Tools
- Non-motorized panning and sluicing only; motorized equipment including suction dredges is prohibited. Source: blm.gov (opens in a new tab), checked November 19, 2026
- Good with kids
- Not listed
Limits and rules
- No recreational placer mining on the San Miguel River upstream of the Piñon Bridge in T. 46 N., R. 14 W., sections 14 and 24. (blm.gov, November 19, 2026)
- Work only in the river channel, at least two feet from vegetated banks and islands, and do not undercut banks. (blm.gov, November 19, 2026)
- Camping is limited to 14 days in any 30-day period. (blm.gov, November 19, 2026)
General BLM rules: collecting on BLM land.
Mining claims
- From the source
- Mineral rights on other public land along the river are privately held claims; mining there needs the claim owner's permission. Source: blm.gov (opens in a new tab), checked November 19, 2026
BLM mining claim records show no active claims within about half a mile of the mapped point. New claims can be filed at any time, so watch for claim markers. Checked November 20, 2026 in BLM MLRS. Claim records are mapped to the quarter section, so treat them as approximate.
How to check for mining claims