- Access
- Public land where the managing agency allows collecting
- Collecting
- Allowed
- Cost
- Not listed
- Season
- Not listed
What you can find
Source: metroparks.org, checked November 19, 2026.
Five Rivers MetroParks park on the Stillwater River north of Dayton with a marked fossil collecting area below Englewood Dam, reached from the Aullwood Garden parking lot.
Land manager and access
- Permit
- Not listed
- Federal land records
- USGS PAD-US lists the mapped point as Englewood Metropark (CITY). Checked November 20, 2026 against PAD-US 4.1.
Getting there
- Directions
- Enter at the Aullwood Garden parking lot, 955 Aullwood Road, and walk to the marked area along the Stillwater River south of Englewood Dam. Source: metroparks.org (opens in a new tab), checked November 19, 2026
- Road
- Not listed
- Vehicle
- Not listed
- Walk in
- Not listed
- Coordinates
- 39.86961, -84.27809 Entrance from the operator’s published street address. Google Maps Apple Maps Source: geocoding.geo.census.gov (opens in a new tab), checked November 19, 2026 (u.S. Census Geocoder match for the address published at https://www.metroparks.org/places-to-go/englewood/; street-range interpolation, approximate entrance)
- Phone
- Not listed
Fees and hours
- Fee
- Not listed
- Hours
- April 1 to October 31, 8 a.m. to 10 p.m.; November 1 to March 31, 8 a.m. to 8 p.m.; closed Christmas and New Year's Day Source: metroparks.org (opens in a new tab), checked November 19, 2026
Season
- Season
- Not listed
Tools allowed
- Good with kids
- Not listed
Limits and rules
- Fossils collected here may not be sold. (metroparks.org, November 19, 2026)
- No climbing on rock ledges or outcrops. (metroparks.org, November 19, 2026)
- Collect only inside the marked fossil area along the Stillwater River and follow the rules posted there. (metroparks.org, November 19, 2026)
Mining claims
BLM mining claim records show no active claims within about half a mile of the mapped point. New claims can be filed at any time, so watch for claim markers. Checked November 20, 2026 in BLM MLRS. Claim records are mapped to the quarter section, so treat them as approximate.
How to check for mining claims